Dec 18,2024

Practical Completion at Wentworth Point High School

"This is a fantastic result for the students and the community of Wentworth Point and surrounds." Damian Vella, General Manager - NSW

PRACTICAL COMPLETION AT WENTWORTH POINT HIGH SCHOOL | Roberts Co is excited to announce the practical completion of Phase 1 of Wentworth Point High School, marking another successful collaboration with School Infrastructure.

Spanning six levels, this innovative high school, is designed to support the growth and development of 1,530 students. With dedicated spaces for science, visual arts, performance, and food technology, the school offers an environment that encourages both academic and creative excellence.

Our partnership with Woods Bagot allowed us to refine the design during the tender phase, ensuring a streamlined footprint, and full compliance with planning, EFSG, and MMOC requirements. The final result is a vibrant, multifaceted space complete with a library, canteen, outdoor workshop and landscaped playgrounds.

Damian Vella, State Director – NSW, expressed his gratitude for the team’s efforts while showing consideration to the neighbouring operational school throughout the build.

“This is a fantastic result for the students and the community of Wentworth Point and surrounds. I would like to commend the entire project team, led by Project Manager, Adam Greentree, on their efforts in delivering this project and maintaining such strong client and stakeholder relationships throughout.”

Roberts Co is proud to have been part of this important project and look forward to the positive impact it will have on future generations.

Project Management: Ernst & Young
Architects: Woods Bagot
Civil and Structural Engineer: TTW
Landscape Architect: Urbis

To view the fly through of the new facilities, watch the video below.