Liverpool Hospital Early Works

Completed

Client Health Infrastructure

Location 75 Elizabeth St, Liverpool NSW

Project Value $25m

Contract Type Design and Construct

Roberts Co is constructing the Stage 1A Infrastructure Works at the Liverpool Health and Academic Precinct for NSW Health Infrastructure.

The scope of the Infrastructure Works includes diversion of existing sewer main which runs through the Hospital site, installation of a new Stormwater system to alleviate the flood risks on Goulburn Street, new HV and ICT conduit networks, adjustment of the existing road network to connect Burnside Drive to Elizabeth Street and new Fire Service infrastructure in preparation for the main works package.

Liverpool Hospital is the busiest operational Hospital in NSW with the complex project requiring complete continuity of current hospital and surrounding precinct operations. 

Construction commenced in January 2020 with a 5-day work week being implemented on the project.

“Our experience with the Roberts Co team has been very positive. At the initial project start up meeting, the team offered to deliver the project safely, to minimise disruption to the hospital operations while always respecting the staff, patients and visitors of the hospital, and we are thrilled that they have delivered on this promise. The team has worked with professionalism and have always been transparent in their approach to works” – Karinn Marrone, Liverpool Health and Academic Precinct Redevelopment Director, South Western Sydney Local Health District.